Request material certifications & technical data sheets — available same day. Get Documentation →
thyssenkrupp steel manufacturing facility

thyssenkrupp — Precision Steel & Industrial Building Solutions

From certified structural steel to intelligent elevator systems — engineered materials trusted by architects, contractors, and procurement teams across 40+ countries.

213 Years of Heritage
40+ Countries Served
ISO 9001 Certified Quality System
±0.5mm Processing Tolerance
EN 10025 Structural Steel Standard
CE Mark CPR Compliant Products
ASTM A36 / A572 Grade Compliance
MTRs Mill Test Reports Standard

What Our Partners Say

thyssenkrupp Steel & Industrial Products

Certified grades, traceable mill documentation, and precision processing — available from regional stock programs worldwide.

flat steel products — hot-rolled and cold-rolled coil

Flat Steel — Hot & Cold Rolled

Hot-rolled, cold-rolled, galvanized, and organic-coated steel strip for structural panels, cladding systems, and precision components. Available in standard grades and customer-specific dimensions.

Request Specs & Pricing →
structural steel sections — beams columns and hollow sections

Structural Sections & Beams

Universal beams, columns, HSS/SHS/RHS hollow sections, angles, and channels. CE-marked structural steel meeting EN 10025-2 S235/S275/S355 grades with full third-party inspection documentation.

Request Specs & Pricing →
stainless steel and specialty alloy products

Stainless Steel & Alloys

304/316 austenitic, duplex 2205, nickel alloys, aluminium plate, and copper & brass strip. Corrosion-critical environments demand material documentation — we provide EN 10204 3.1 certificates as standard.

Request Specs & Pricing →
thyssenkrupp MRL elevator system interior design

Elevator Systems

Machine-room-less traction elevators, hydraulic lifts, stair lifts, and cab interior design. From new installations to full modernization — engineered for reliability, safety certification, and 25+ year service life.

Request Specs & Pricing →
steel processing — plasma cutting and CNC fabrication

Steel Processing Services

Precision slitting to ±0.1mm, plasma and laser cutting to ±0.5mm, CNC press braking (up to 1,000t), hot-dip galvanizing, and surface treatment. Reduce your supply chain steps and lead time.

Request Specs & Pricing →

Mill Certificates & Technical Data

EN 10204 3.1 material test reports, third-party inspection certificates, chemical and mechanical property data — available digitally within 24 hours of order confirmation.

Request Documentation

Decarbonizing Heavy Industry — One Heat at a Time

thyssenkrupp's direct reduction hydrogen steelmaking program — currently in industrial-scale commissioning at the Duisburg site — targets a 30% reduction in CO₂ intensity per tonne of crude steel by 2030, advancing toward carbon-neutral operations by 2045.

  • Hydrogen-based direct reduction replacing blast furnace operations
  • 100% renewable electricity procurement for processing centers
  • ISO 14001:2015 environmental management certification across all sites
  • Scope 3 emissions reporting for supply chain transparency
Green Steel Technical Overview
thyssenkrupp green steel sustainable manufacturing facility

Industries We Serve

Precision materials and engineered solutions for the most demanding construction and industrial environments.

Commercial Construction

Structural steel for office towers, retail centers, mixed-use developments, and high-rise residential projects.

Learn More →

Infrastructure & Civil Engineering

Bridge girders, highway infrastructure, tunneling support, port facilities, and rail structures requiring certified plate and section steel.

Learn More →

Industrial Manufacturing

Precision steel for machinery frames, pressure vessels, process equipment, and industrial automation structures.

Learn More →

Elevator & Vertical Transport

Complete elevator systems, modernization programs, and cab interior design for commercial, residential, and hospitality buildings.

Learn More →

Energy & Power Generation

Steel for power plant structures, wind tower components, solar mounting systems, and high-pressure pipeline infrastructure.

Learn More →

Marine & Offshore

High-tensile marine-grade steel, shipbuilding sections, and offshore platform components meeting DNV, Lloyd's, and BV classification society requirements.

Learn More →

Ready to Specify thyssenkrupp Materials?

Our technical sales team will prepare a detailed quotation with material grades, dimensions, pricing, and delivery schedule — typically within 24 hours.